Project Overview
Amiri delivered the design and build of four new retail units, totalling 46,575 sq ft, constructed to a shell and core standard.
The development also included external service roads and yards, car parking areas, associated drainage, and ancillary infrastructure works. Following the main build, offsite Section 278 works were completed to enhance local highway access and connectivity.
The Mill Lane Retail Park was designed to accommodate a mix of national retailers, including Lidl, Home Bargains, and Costa Coffee, each with their own specialist fit-out teams completing the internal works after handover.
A key element of the project involved the use of lime stabilisation as an innovative ground remediation technique, improving soil conditions while reducing material waste and environmental impact.



Key Challenges & Solutions
Ground Conditions and Soil Remediation: Initial surveys identified challenging ground conditions that could have led to costly and time-consuming remediation works. Amiri implemented lime stabilisation to treat and strengthen the existing soils, eliminating the need for large-scale excavation and disposal, reducing vehicle movements, and achieving substantial cost and environmental savings.
Multiple Retail Tenants and Fit-Out Coordination: The development needed to accommodate different retailer requirements post-construction. Early coordination with tenant fit-out contractors ensured that shell and core delivery aligned with individual retailer specifications, allowing seamless transitions to their bespoke fit-out phases.
Offsite Infrastructure and Access: Section 278 highway works had to be carried out after completion without disrupting newly occupied units. A phased approach and close liaison with local authorities enabled safe, efficient completion of all external works while maintaining full access to the retail park.

Project Outcomes
The completed retail park provides modern, energy-efficient retail space that supports the economic growth of Alton and enhances local shopping amenities. The scheme has successfully attracted prominent high-street retailers and created new employment opportunities for the area.
The project demonstrates Amiri’s expertise in managing complex retail developments from design through to completion, while maintaining a strong focus on value, sustainability and quality.









-

FEATURED PROJECT
BURNT COMMON BUSINESS PARK, WOKING
Construction of a modern industrial development in Woking, delivering 21 high-quality units across three blocks, supported by extensive infrastructure, external works and sustainable building solutions.
-

FEATURED PROJECT
EASTERGATE MEDICAL CENTRE, CHICHESTER
Design and construction of a new two storey primary healthcare facility for Primary Health Properties in Chichester. The building provides modern clinical and support accommodation designed to meet the needs of a growing patient community.
-

FEATURED PROJECT
BUCKMORE PARK, PETERSFIELD
Design and construction of a bespoke vehicle storage facility. The building was conceived to provide a secure, efficient and luxurious environment that meets the exacting standards of both the vehicles and their owners.
-

FEATURED PROJECT
PLATINUM JUBILEE BUSINESS PARK, RINGWOOD
Design and construction of five single-storey industrial units together with two-storey office buildings. Amiri was appointed by New Forest District Council to design and build five single-storey industrial units and two two-storey office buildings, providing a total of 49,458 sq ft of high-quality employment space.
-

FEATURED PROJECT
SUSSEX AND SURREY INSTITUTE OF TECHNOLOGY – CRAWLEY COLLEGE
A four-storey, state-of-the-art facility designed to meet the region’s growing demand for advanced technical education. The 2,600m² building provides cutting-edge teaching and practical spaces for students specialising in Engineering and Manufacturing Technologies, Information and Communication Technology, and Construction and the Built Environment. The new institute features specialist “Learning Factories” that replicate real-world working environments, enabling…